From:                              route@monster.com

Sent:                               Tuesday, December 01, 2015 2:35 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Primavera P6

 

This resume has been forwarded to you at the request of Monster User xapeix01

Christopher Latino 

Last updated:  04/21/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Benton, KY  42025
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Chris Latino's Resume

Resume Value: 2f6stb77ibe4g5hd   

  

 


COURSEWORK:                —Applied Hydrology                                                        — Microsoft Excel, Project, Word

—Foundations                                                                        — HEC-RAS and WMS                           

—Surface Water Quality & Monitoring                            — Retaining Walls & Structures

—Soil Mechanics                                                                       — Primavera             

                                              —Advanced Hydrology                                                          — Water Supply and Pollution Control

                                              —Engineering Management                                                          — HYPACK


 

APPLIED                                  Design: Utilized ArcMap and AutoCAD to prepare maps and plans for underground storage

EXPERIENCES:                basin and sewer distribution design. Plans included grading, preliminary sanitary sewer layout, and existing topography.

              Sewer Inspection: Used TVI technology and inspected manholes to evaluate sewers. Inspected sewers to determine where illicit sanitary sewer pipes were still connected to storm sewers as part of an evaluation to eliminate Combined Sewer Overflows in Jefferson County, KY.

Water Quality Sampling: Coordinated dry weather water quality sampling (bacteria) and field assessments (lamping and Quickview camera scoping) of approximately 100 manholes to verify successful separation of storm sewer.

Confined Space Entry: Assisted in manhole entry (per confined space training guidelines and OSHA requirements) to perform water quality sampling of two storm lines to verify successful separation of sanitary and storm sewer systems.

              Project Management: Assisted in maintaining schedules of the water treatment process for the Rehabilitation of Mixing and Clarification Basins 1, 2, 3 and 4 at the Crescent Hill Water Treatment Plant.

              Project Scheduling: Head project scheduler for renovations of Gaffey Hall on Fort Knox Army Base. Maintained daily schedule updates, made necessary logic changes, and meet with multiple contractors to discuss projected work schedule.

              QA/QC: Assisted on-site civil engineer with daily inspection of concrete, roofing, and storm drainage activities taking place at Gaffey Hall on Fort Knox Army Base.

Business Development/Marketing: Assisted in the production of routine proposals for multiple clients.

Survey: Used RTK unit to perform topographic surveys. Performed hydrographic surveys using HYPACK software and evaluated surveys using AutoCAD and several HYPACK components.  

 

EMPLOYMENT                            O’Brien & Gere, Louisville, KY                                         

HISTORY:                            Co-Op                                                                                                                           Fall 2009 & Spring 2009

                                          — Used AutoCAD to digitize plans

                                          — Used ArcMap to prepare maps with GIS data

                                          — Field Inspection

                                         

Intersteel, Inc. Louisville, KY                                                                  April 2010-October 2010

                                          Project Scheduler                           

                                          — Used Primavera software to track daily progress of large scale project

                                          — Roof Inspection, Storm Drainage Inspection, Concrete Inspection

                           

 

 

 

Marine Mechanics Inc., Paducah, KY

                                          Mechanics Helper and Accounting                                                                 January 2004 - August 2006

                                          — Aided in an overhaul of a towboat engines

— Paid bills and sent invoices

 

                                          University of Louisville Work Study, Louisville, KY                                   

                                          Grader                                                                                                                August 2008 - August 2009

                                          — Graded hundreds of students Calculus I-III papers

             

University of Louisville, Louisville, KY                                                     October 2010-May 2011

Research Assistant

                            — Hydro Kinematic Research

                           

Great Lakes Dredge & Dock, Oak Brook, IL                                                                        July 2012 – Present

Site Engineer

— Production and Productivity Reports

— HYPACK

— Data compilation and evaluation  

— Conducted hydrographic and topographic surveys

— Construction Management

— Ability to work in extreme conditions

 


 

ACTIVITIES                             — EIT

& HONOR:                            — Graduated from University of Louisville with Honors

—Chi-Epsilon Honor Society Secretary

— CQM (Construction Quality Management Certification)

                                          — ASCE

 


— Certified Lifeguard (CPR/AED/First Aid)

 

Christopher Latino

387 Grover Ln., Benton, KY 42025 ¨ Cell: (270) 556-8931 ¨    cslati01@gmail.com

 

OBJECTIVE:                            Seeking Fulltime Employment                                                                            End of May 2012

                                         

EDUCATION:                            M. Eng. in Civil Engineering                                                                                         Received May 2012

                                          B.S. in Civil Engineering                                                                                  Received December 2011

                                          Environmental Certificate                                                                                       Received May 2012

J.B. Speed School of Engineering, U of L, Louisville, KY                                    Undergrad GPA: 3.22 / 4.0

                                                                                                               Masters GPA: 3.73/4.0

                                              Dates attended 8/2006 - present                                                                    Hours Completed: 186

 

                                                    High School Diploma                                                                                                            May 2006

                                          Lone Oak High School, Paducah, KY                                                                          

        

SKILLS/                             —Green Engineering                 — Groundwater



Additional Info

BACK TO TOP

 

Current Career Level:

Entry Level

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-KY-Bowling Green/Paducah